Zamboanga del Sur shall emerge as an agri-industrialized
province with self-reliant and productive citizenry enjoying equal
opportunities socially, economically and politically, in an atmosphere
of peace, justice and healthy economy, God-centered and pro-people
community.
| Goals |
Strategies |
Key Result Areas |
|
Goal 1
Adequate and efficient infrastructure facilities in the Province
|
Improvement of existing provincial roads
|
Primary provincial roads constru (concreted), secondary provl.
l roads roads improved (asphalted)
|
|
Construction, improvement of concrete bridges
|
Concrete bridges constructed
|
|
Construction of Level I, II and III water supply systems
in both urban and rural communitie
|
Level I, II and III water supply systems constructed/ rehabilitated.
|
|
Provision of adequate funds for provincial roads maintenance
|
Provincial roads maintained.
|
|
Provision, expansion, improvement of convenient water transport
facilities and causeway among coastal municipalities
|
Water transport facilities, causeway and berthing space provided,
improved, expanded
|
|
Expansion/improvement of Pagadian City Airport
|
Pagadian City Airport improved and expanded
|
|
Training of BWSA officials on operation and management of
water system
|
BWSA officials trained on operation and maintenance of water
system
|
|
Construction of small-scale irrigation projects
|
Small-scale irrigation systems constructed.
|
|
Construction of provincial road network to interconnect municipalities
in coastal areas
|
Provincial road network interconnecting municipalities in
coastal areas constructed
|
|
Construction of flood control structures; dredging and straightening
of curves on major rivers in Salug Valley Area
|
Flood control projects constructed; major curve rivers straightened
and dredged.
|
|
Construction of FMR
|
FMR constructed
|
|
Construction/ Rehabilitation Repair of School Buildings (E/S
& H/S)
|
School buildings constructed/ rehabilitated/ repaired
|
|
Encourage the participation of Irrigators' Association in
trainings re-proper operation and maintenance of water systems.
|
Irrigators' Associations participated in Water Mgt. Training.
|
|
Maintenance of Barangay roads
|
Barangay road maintained.
|
|
Establishment of additional telegraph/telex facilities, AM/FM
stations and carrier service stations in order to improve
communication services of the Province
|
Additional telegraph/telex facilities, AM/FM stations and
carrier service stations established.
|
|
Construction/ Improvement/ Rehabilitation of Fishport facilities
|
Fishport facilities constructed/ improved/ rehabilitated.
|
|
Assistance of both local and national governments in barangay
energization efforts of Electric Cooperatives through financial
assistance for the cost of electric lines in remote barangay
|
Remote barangays energized
|
|
Goal 2
Healthy, literate, and safe constituents with access to social
welfare services
|
Upgrading of health facilities and services; upgrade skills
of health personnel/workers
|
Public hospitals modernized; emergency clinics established;
skills of health workers improved; free medical services provided
|
|
Upgrading educational facilities and instructional materials;
extend scholarship grants
|
|
|
Goal 3
Poverty alleviation of farmers and fisherfolks
|
Employment generation through promotion of investments and
off-farm entrepreneurial activities
|
Investment generated, employment generated, off-farm activities
established
|
|
Shift from traditional to high value commercial crops
|
High value commercial crops crops planted, produced and marketed
through contract growing scheme
|
|
Goal 4
Properly and wisely utilized, protected, conserved, managed
and developed natural resources of the Province to attain
a sound ecological balance and healthy environment.
|
Implement sustainable environmental and eco-forest programs
|
Denuded forest lands massively planted with trees; fish sanctuaries
rehabilitated and developed
|
|
Conduct sustained information and mobilization on the Solid
Waste Management Program
|
Solid Waste Management Program sustainably implemented
|
|
Goal 5
Highly committed, capable, competent and effective local
governance
|
Strengthening of provincial institutions and implementing
mechanism for effective, efficient and responsive delivery
of basic government goods and service
|
Increased collection of taxes
Extensive involvement participation of CSOs/POs
Local special bodies strengthened
Intensive dialogues, consultations and community outreaches
conducted
Capability building program for officials and employees conducted
|